DCD>Zettastructure: The edge offers opportunities, but requires new solutions
With the advent of edge computing, manufacturers must keep a finger on the pulse, says Michael Adams
With the advent of edge computing, manufacturers must keep a finger on the pulse, says Michael Adams
To ensure European rules are well understood ahead of US DoJ ruling next year
It’s not all about London, Dublin and Amsterdam, says Patrick Ohlund
The company had been planning five stages of development over the course of 20 years
In a 5,800 square meter, three-story building
Signing up for up to 96MW of wind and solar power capacity, or 324,000MWh a year
With enough space and power to support up to 100 petaflops of compute
Claiming that data centers with no diesel generators aren’t fault-tolerant just isn’t in line with operators’ green aspirations, says Lex Coors
Subsidiary VirtuDC to operate network of edge facilities
With decentralized data centers, it’s not just a matter of making smaller versions of the same hardware - everything has to change
Painting a brighter picture than FITARA reports
The two locations total 148 acres of land
The mysterious outfit shows what it’s made of
With plans to introduce additional capabilities early next year
The Johannesburg facility will become the first Nexcenter location in Africa
Having signed a memorandum of understanding with local cloud company Streamcast Technologies
Operators want greener, cheaper, more efficient systems, but they don’t want to pay for them
To expand and upgrade the facility, as well as for staff training and career development
Bringing down systems across the city of Cairns
Including a $50m revolving credit facility
The unnamed company plans to build the facility in three stages
Promising “a frictionless path to Azure”
By installing Coriant interconnection modules in data centers throughout the capital
The colocation start-up’s first facility