The renewable energy deal that looks cheap on paper can leave data centers most exposed
New analysis shows the best-matched clean power portfolio is also the strongest hedge against price shocks
Do you have an opinion or industry view you think is of interest to DCD readers? See the submission guidelines
New analysis shows the best-matched clean power portfolio is also the strongest hedge against price shocks
Intensive workload deployments require the wholesale redesign of data centers
Airflow intelligence was built to close the gap between a facility's design PUE and its actual PUE. Clean air is what keeps that gap closed
Stop asking for permission and start offering solutions
In a world where power has become the ultimate currency, you can no longer afford to waste it
America’s data centers are about to draw power on the scale of entire nations
One of the prevailing challenges in AI infrastructure is the mismatch between technology and infrastructure cycles.
A closer look at the legal framework and practical issues
Why data center leaders should no longer evaluate surveillance and access systems solely as security investments.
How to prioritize power to accelerate your project pipeline
Is HTS starting to make sense for data center operators?
Water has become one of the newest variables in data center planning – and one of the most regulated
Why the data center industry is moving away from just Northern Virginia
Grid flexibility depends on who can change a live system, when they can do it, and how the site recovers.
The next decade of digital infrastructure will be shaped by how quickly power can reach the right place, at the right time, at an acceptable cost
Identifying which liquid cooling architecture to design for
A view for hyperscalers, colos, and infrastructure capital
Building the infrastructure of tomorrow requires an entirely new approach that moves far away from bespoke, piecemeal solutions
To support rapid AI growth
Increasing densities, equipment varieties, and services have led to complexity challenges. What the market needs is integrated solutions from a provider that can support the AI wave at every step
The question may not be whether cooling infrastructure can operate on 800VDC. It’s whether the supplier ecosystem can evolve quickly enough to support that future
The choices organizations make today will influence not only performance and reliability, but also how the next generation of data centers is designed and operated.
As data center power density climbs, successful infrastructure planning depends on understanding how power availability, cooling strategy, and deployment timelines influence one another
A power-first mindset amid AI at scale and aging infrastructure
In addition to protecting critical infrastructure, AI-ready UPSs also help optimize AI investments, enhance operational resilience, and mitigate the impact of large-scale AI workloads on the electric grid
What happens after the hardware is commissioned?
The companies that succeed in the AI era will be the ones that solve the infrastructure challenge at every layer between the grid and the rack
Why solar energy and battery storage are critical pieces of the data center power puzzle