Sponsored Competency over credentials: Is the data center industry measuring the right things?
The question is not whether standards should change. It is whether we are measuring the right things to uphold them
Do you have an opinion or industry view you think is of interest to DCD readers? See the submission guidelines
The question is not whether standards should change. It is whether we are measuring the right things to uphold them
“A long time ago in a galaxy far, far away…”
Airflow intelligence was built to close the gap between a facility's design PUE and its actual PUE. Clean air is what keeps that gap closed
Intelligence is too valuable to be lost at handover
As IoT grapples with both legacy and modern technologies
Why infrastructure models must enable global reach while addressing local requirements
The growing need to future-proof infrastructure
Data centers cannot afford to treat communities as an afterthought
The most successful data center developers will not be those making the boldest sustainability claims. They will be the ones willing to have those claims independently measured, tested, and verified
Community and social impact management is not simply a risk to be mitigated, but an opportunity to build the durable trust and maturity the sector will need
The argument for greater use of performance metrics
Measuring water consumption at the facility level is no longer sufficient. A comprehensive approach must consider the full lifecycle, integrating energy production, geography, and climate
While building infrastructure is important, protecting its performance for the next twenty years is what truly creates value
In today’s risk-filled digital age, secure data disposal isn’t optional, it’s essential
Designing for adaptability is not simply about preparing for uncertainty. It's about building power infrastructure that remains resilient, efficient, and sustainable throughout its entire lifecycle
From first alert to issue resolution, every action must be traceable
Industry and government must partner to scale the commercially available tools that improve utilization of our existing grid now, advancing both speed to power and affordable electricity for all consumers
As hyperscale growth continues and sustainability expectations intensify, sustainable electrification will increasingly depend on how intentionally the industry approaches electrical infrastructure decisions
The importance of innovation, investment in infrastructure, and global engagement
Implementing a risk-based sanitization strategy ensures that data protection continues even after devices leave active service – closing a critical gap in modern cybersecurity
Those who succeed will be the ones who treat standardization not as a document to follow, but as an operating discipline to internalize
The industry is not running out of demand. It is running into reality. And reality, in this case, is local
Europe’s challenge is to invest in low carbon energy production, stronger electricity networks, and digital infrastructure capable of supporting sustainable continued growth
And how the industry can meet the demand
Why the roof should be viewed as a strategic asset rather than a covering
This isn't a merger or a rebrand. This is a structural shift
Extreme weather conditions aren't a rarity anymore; sufficient preparation for such events is vital
Net zero in the age of AI: How sustainable innovation is powering progress