Microsoft-led study develops seaweed-based cement, claims 21% carbon emissions reduction
Utilized Machine Learning to design and test cement mixes
Utilized Machine Learning to design and test cement mixes
Will optimize electricity production through AI
Arizona Public Service and Salt River Project to use new capacity to support data centers
Utility reaches settlement with PSC to recommend approval of data center
Includes the option to expand to up to 1GW across additional sites
Set out plans for extensive testing to determine volume of supply
Aim to displace use of diesel in data center backup generators
"Actively working" with utility We Energies
Revenue surges 19.5 percent from last year
Backs new electricity rate for large power users
Aim to lessen wait times for data centers seeking a grid connection
A 33 percent jump on the previous quarter
American Electric Power and Aspire Energy Express sign pipeline deal
Could be "the largest nuclear power complex in America”
ERCOT to grow at an average rate of 11 percent in 2025 and 2026
1.5GW of which is in final engineering stage
17GW in line to connect into the system
Erected the first timber structure earlier this year
Expected to be operational in Q4 2026
Added more than 4GW of peak demand since last year, largely the result of new data centers
Still needs to acquire the final permits from state government
Includes an LOI for an additional 203 acres
Utility in advanced discussions with hyperscalers for more than 3GW of new load
Will support the repowering of the Leaning Juniper IIB project