Panel: How can digital infrastructure keep up with the pace of demand in 2024?

  • Watch on-demand now
  • The Data Center Construction Channel
Speakers

This episode is available to stream on-demand

The average capacity of hyperscale data centers to be opened over the next six years will soon be more than double that of current operational hyperscale data centers. This represents a huge demand on an already strained grid. The boom in AI, as well as public consumption of data, represents both an immense challenge and opportunity for the sector. In this episode, speakers will explore:

  • How exponential demand for data is shaping the industry’s landscape, and practical strategies for how data centers can meet this.
  • Whether tier 2 markets will overtake tier 1 as they become increasingly strained by land and power, and the potential of retrofitting for AI workloads
  • The most innovative construction methods to ensure large-scale and effective expansion
  • How to balance speed-to-market with resiliency in a challenging workforce & supply chain environment

Related Episodes