Tech showcase: Exploring the future of data center infrastructure – Introducing the new Tate Grid+ LEC

  • Watch on-demand now
  • The Data Center Construction Channel
Speakers

This episode is available to stream on-demand

Structural ceilings are now a crucial component within the white space of data centres, which serves a dual purpose. Acting as plenum which enhances airflow, as it allows for the distribution of cool air and the efficient removal of hot air, contributing to the optimal cooling & energy efficiency within the data center. Tate Grid+ LEC functions as a high-strength platform for the attachment and suspension of critical infrastructure and heavy equipment, empowering ceiling supported containment, partitions, cable trays attachment, surface-mounted mechanical and electrical equipment. Tate’s next evolution of structural ceiling products, Tate Grid+ LEC is his latest innovation from their Lower Embodied Carbon (LEC) range. This Tech Showcase will explore how Tate Grid+ LEC:

  • Features a safety factor of 2, offering reliable performance backed by rigorous full-scale testing which has been independently verified
  • Is future proofed with an increased load capacity of 2.2Kn.
  • Reduces carbon emissions to more than half that of standard Tate Grid
  • Provides faster installation with the new sleek profile