This episode is available to stream on-demand.
From thermal overload and grid strain to physical limitations in raised floors and outdated power panels, the industry faces a critical inflection point as the shortcomings of legacy infrastructure continue to be exposed. This episode discusses the core infrastructure challenges data centers must overcome, including whether retrofitting poses structural and electrical hurdles, why traditional air cooling is no longer viable, and how operators are bridging the gap between legacy and AI facilities. Join this episode to:
- Explore key infrastructure bottlenecks for AI data centers
- Discuss tradeoffs between retrofitting and greenfield builds
- Understand the operational benefits of integrated liquid cooling systems