Modular solutions for AI deployment

This session took place on October 24, 2024

Please complete the following form to access the full presentation.

Data Center Construction SITE THUMBNAIL

Watch this Broadcast

This episode will stream live at 9:00am ET

AI has rapidly changed data center design, and from an infrastructure point of view, mechanical, electrical and cooling designs must adapt. As rack load densities exceed 50kW and even 100kW, designs must consider how extreme power and cooling densities are going to be achieved. In this episode, DCD will be joined by Schneider Electric's Tuan Hoang to explore if the type of AI load will determine deployment location, and how designs are scaling and adapting to realize the benefits of AI. We will discuss:

  • The advanced cooling technologies being leveraged for advanced workloads
  • The role of standardization in developing adaptable and scalable designs for AI
  • How modularization is supporting rapid deployment enabling a competitive edge
  • Secure and simplified supply chain as a driver for reliable scaling
Speakers
Brought to You by
Schneider Electric (Life Is On)