AI-driven data center growth across the Americas is exposing critical limitations in existing power infrastructure. Lengthy grid interconnection queues, transmission constraints and permitting delays are creating a growing gap between the demand for electricity and the ability to deliver it.

This whitepaper from Wärtsilä examines how developers can overcome these challenges through a new approach to data center power, exploring off-grid and co-location solutions, macro-grids and flexible on-site generation.

It compares reciprocating internal combustion engines (RICE) with alternative generation technologies, highlighting differences in efficiency, reliability, water consumption and long-term operating costs.

Discover why securing power requires more than speed to market, and how a longer-term approach to energy infrastructure could determine which regions lead the next phase of AI growth.