How Foresight prevented $100m in delays and cut reporting overhead by 90% for a global data center portfolio
From blind spots to breakthroughs
From blind spots to breakthroughs
Scaling the future of AI infrastructure in Spain
Australian Certified HP SitePrint Service Provider completes over 9,000 m² and 4,300 bolt layout points for data center rack base plates in just 17 hours
Ensure your infrastructure is ready for service on day one
Balancing speed, cost, and risk in modular data center deployment.
How autonomous, pay-per-use layout technology is accelerating MEP delivery and improving safety in data centre construction
Keep your data center projects on time and on budget
How autonomous layout technology is accelerating delivery and eliminating rework in large-scale, prefabrication-driven data center builds
Exploring attitudes and trends in data center construction in 2025
How a holistic white space strategy enables faster delivery, reduced risk, and scalable data center performance
How autonomous layout printing is accelerating data center construction while reducing risk
The ten trends redefining how data centres will be planned, powered, and delivered in 2026
A strategic roadmap to achieve net-zero carbon and reduce environmental impact
Exploring the challenges and trends surrounding data center construction in 2025
Key challenges and opportunities shaping data centers in 2025
The second largest data center market within the United States is an increasingly attractive location for new data center projects.
On time, every time.
Six scrupulous sensor decisions for data center design
The six core benefits of specifying a roof cover board for your project
Discover proven strategies to overcome delays, reduce costs, and future-proof your infrastructure.
A look at the future of the largest data center market in the US
How a data center avoided $4.14m in project costs
Risk factors and their mitigation through resilient roof design.
By November 2022, the asset owner believed that construction progress was ahead of schedule. In reality, they were sleepwalking towards a massive six-week delay.
Design and specification guidance to support 'non-combustible' roof design on commercial buildings for mission critical environments.
A quantitative TCO analysis of the two architectures
An investigation into the effect of different panel materials on a cold aisle temperature rise
Growing workload requirements and energy consumption continues to dominate industry news