As data centre builds become larger and more complex, MEP and HVAC layout teams are under pressure to deliver greater speed, accuracy, and cost control, without increasing labour risk or overhead.

This whitepaper explores how Brandt, a leading MEP contractor, deployed HP SitePrint on a live data centre project to transform its layout process. By replacing traditional and subscription-based robotic methods with a pay-per-use, Total Station–integrated solution, Brandt dramatically increased productivity, reduced costs, and improved on-site safety.

Through a real-world case study, the paper demonstrates how autonomous layout technology can cut layout time by more than five times, eliminate unnecessary equipment costs, and integrate seamlessly into existing workflows, helping contractors deliver faster, safer, and more predictable outcomes on mission-critical data centre projects.