Secure your pass
  • DCD Showcase Stage
  • Energy & Sustainability
  • Mission Critical Power
  • Open Session
Untitled design (1)

Speakers

Dan Nadav

Business Development Heat Recovery – Senior Consultant, Turboden


Power availability has become the critical constraint on data center development. 
Interconnection delays, generation-equipment long lead times, water limitations, and increasingly complex permitting can prevent otherwise viable projects from moving forward.

This session will examine how the power boosting technology of Turboden, a Mitsubishi Heavy Industry company, converts waste heat from on-site gas turbines, reciprocating engines, and other power-generation systems into additional reliable electricity.

Join Dan Nadav to explore how waste-heat-to-power systems can accelerate time-to-power, improve fuel efficiency, reduce operating costs and carbon intensity, and extract more capacity from existing generation and gas infrastructure.