Connect | London // DCD>Project Showcase: How to secure fast, large-scale grid connections | Eclipse Power
- —
- DCD>Showcase Stage
- Mission Critical Power
- Open Session
Speakers
Director of Group Sales, Eclipse Power Group
Content Manager - APAC, DatacenterDynamics
If you can afford to wait for monopoly network operators to build the infrastructure for grid access, walk away now. If you can’t, stick around. Find out how Eclipse Power is breaking the mould by reforming grid access, bringing in private capital and agility, and delivering a 1.4 GW grid connection before 2030 — a blueprint for large-scale power connections.
