Tech showcase: How AI can streamline commissioning for mission critical facilities

  • Watch on-demand now
  • The Data Center Construction Channel
Speakers

You can now ask questions directly within our broadcasts using our new AskAI feature.

Data center commissioning is one of the most challenging early-stage processes for data center construction, defined by a complex and lengthy process and manual imput. This tech showcase will introduce Facility Grid’s AI checklist, which provides an innovative solution to manually building checklists or dropping spreadsheets into generic AI platforms.  Intentionally designed with customer input, the AI checklist was built on commissioning standards, specifications, and workflows, and gives users full control over every output.  This session will also provide an insider look at AI feature development for commissioning tech and Facility Grid’s approach to architecting AI for mission critical construction.  We will explore: 

  • The process of creating fully editable, consistent and complete checklists and FPTs with the AI Questionnaire Generation tool  
  • Facility Grid’s commissioning platform’s domain-specific AI toolbox developed for quantifiable ROI
  • The results of ethically built AI built from customer input without stealing user data
  • Facility Grid's holistic approach to AI and our customer-driven roadmap for upcoming new features  

Related Episodes