Tech showcase: High-performance structural ceiling solutions for scalable data centers

  • Watch on-demand now
  • The Data Center Construction Channel
Speakers

You can now ask questions directly within our broadcasts using our new AskAI feature.

With the pace of modern data center construction that the industry is experiencing, flexibility and efficiency are crucial.  Hilti’s structural ceiling grid system is engineered to meet the evolving demands of modern data centers. Designed as a fully integrated solution for supporting mechanical, electrical, and IT infrastructure, it combines high load capacity with modular adaptability. These structural ceiling solutions enable faster deployment, improved airflow management, and long-term scalability, helping operators improve speed-to-market and operational performance.  This tech showcase will explore:

  • How Hilti's structural ceiling solution supports up to 40% higher loading
  • How to reduce installation by up to 20% through modular design and elimination of unnecessary substructures
  • Optimizing total cost by combining material savings, reduced labor, and built-in flexibility
  • How to improve environmental operational impact by lowering CO2 emissions up to 57%

Related Episodes