Tech showcase: Exploring the future of data center infrastructure – Introducing the new Tate Grid+ LEC
This session took place on November 29, 2024
Please complete the following form to access the full presentation.

Tech showcase: Exploring the future of data center infrastructure – Introducing the new Tate Grid+ LEC
This episode is available to stream on-demand
Structural ceilings are now a crucial component within the white space of data centres, which serves a dual purpose. Acting as plenum which enhances airflow, as it allows for the distribution of cool air and the efficient removal of hot air, contributing to the optimal cooling & energy efficiency within the data center. Tate Grid+ LEC functions as a high-strength platform for the attachment and suspension of critical infrastructure and heavy equipment, empowering ceiling supported containment, partitions, cable trays attachment, surface-mounted mechanical and electrical equipment. Tate’s next evolution of structural ceiling products, Tate Grid+ LEC is his latest innovation from their Lower Embodied Carbon (LEC) range. This Tech Showcase will explore how Tate Grid+ LEC:
- Features a safety factor of 2, offering reliable performance backed by rigorous full-scale testing which has been independently verified
- Is future proofed with an increased load capacity of 2.2Kn.
- Reduces carbon emissions to more than half that of standard Tate Grid
- Provides faster installation with the new sleek profile
- Brought to You by
- Tate