Stream now: DCD Broadcast - Back-Up and Generation 2026

New episodes released every month

Tech showcase: New Tate Grid LEC - Halve the embodied carbon of your structural ceiling solutions

This session took place on February 29, 2024

Please complete the following form to access the full presentation.

Data Center Construction SITE THUMBNAIL

Tech showcase: New Tate Grid LEC - Halve the embodied carbon of your structural ceiling solutions

This episode is available to stream on-demand

The New Tate Grid LEC is specifically designed for high-performing data centers, pioneering lower embodied carbon structural ceiling solutions. Tate Grid LEC has half the embodied carbon of the standard Tate Grid. Developed by Tate’s in-house team of engineering design experts, this market-first for Tate Europe is part of the new Lower Embodied Carbon (LEC) range of solutions and a significant step forward in keeping with the Planet Passionate sustainability strategy. This tech showcase will explore:

  • How a 55% reduction in embodied carbon was achieved (modules A-C) compared to the standard product (verified to EN15804+ A2:2019)
  • How the product is made using lower carbon aluminium
  • The Environmental Product Declaration for Tate Grid LEC
Speakers
Brought to You by
Tate