Connect | London // Data Center Construction Welcome Lunch Briefing
- —
- Data Center Construction
- Invite-only Session
Speakers
Joe Hughes
Mission Critical Director, XYZ Reality
Leam Goff
Delivery Director, XYZ Reality
Anthony Canipa
VP of Customer Operations, XYZ Reality
Quality drives speed: Proactive verification delivering an early handover
When quality becomes a discipline, not just a metric, delivery accelerates. Across three consecutive builds with the same developer, XYZ Reality joined earlier each time: first at 60%, then 25%, then from day one. The result? A 40 MW facility handed over three weeks early, with 99.7% of tracked issues resolved before commissioning.
By verifying proactively, checking every element against design before the next trade builds over it, the team fixed problems while they were still cheap. That discipline created £4 million in rework avoided, 71,956 labour hours returned to productive installation, and up to £2.5 million in extra revenue unlocked.
In this session join our hosts XYZ Reality to explore:
- How XYZ verifies installed work against design in real time
- Why proactive verification changes what’s possible when built in from day one
- How earlier engagement across three builds drove exponential returns
- Why “Clean at Green” protects commissioning, not just the installation
This session is by invitation only - If you are interested in being invited please email [email protected].