Secure your pass
  • Data Center Construction
  • Invite-only Session
XYZ New logo 349 175.png

Speakers

Joe Hughes

Joe Hughes

Mission Critical Director, XYZ Reality

Leam Goff

Leam Goff

Delivery Director, XYZ Reality

Anthony Canipa

Anthony Canipa

VP of Customer Operations, XYZ Reality

Quality drives speed: Proactive verification delivering an early handover 

When quality becomes a discipline, not just a metric, delivery accelerates. Across three consecutive builds with the same developer, XYZ Reality joined earlier each time: first at 60%, then 25%, then from day one. The result? A 40 MW facility handed over three weeks early, with 99.7% of tracked issues resolved before commissioning.

By verifying proactively, checking every element against design before the next trade builds over it, the team fixed problems while they were still cheap. That discipline created £4 million in rework avoided, 71,956 labour hours returned to productive installation, and up to £2.5 million in extra revenue unlocked.

In this session join our hosts XYZ Reality to explore:

  • How XYZ verifies installed work against design in real time
  • Why proactive verification changes what’s possible when built in from day one
  • How earlier engagement across three builds drove exponential returns
  • Why “Clean at Green” protects commissioning, not just the installation 

This session is by invitation only - If you are interested in being invited please email [email protected]