This episode is available to stream on-demand
From accelerating construction permitting process, navigating commissioning, and developing designs prepared for continued capacity growth, the data center construction landscape has never been complex to navigate. Modular solutions provide flexibility and speed-to-market, but it is crucial to consider the foundations to make them a success. In this episode, Eaton and Siemens Energy delve into the foundational requirements for onsite power generation, including:
- Technical requirements for onsite generation and modular construction
- Navigating the complexity of commissioning, and how we make it easier
- Developing a future-ready design to account for AI growth
- Putting plans in place for when grid connections come online