Tech showcase: Building an AI-ready data center in Spain using a modular approach

  • Watch on-demand now
  • The Data Center Construction Channel
Speakers

You can now ask questions directly within our broadcasts using our new AskAI feature.

Nabiax’s approach to developing ADC3, located within its Alcalá de Henares campus, is based on an AI‑ready architecture that combines an adaptable modular framework, high‑density capabilities and thermal flexibility to meet the evolving requirements of AI workloads.  This tech showcase will explore how a modular construction process enabled versatile cooling options and reinforced power infrastructure to create an environment ready for next-generation technologies.  We will unpack:

  • How an adaptable modular approach allowed IT room configurations to be tailored to specific thermal and operational needs
  • Prefabrication strategies enabling full cooling flexibility, supporting both liquid and hybrid solutions
  • Modular power infrastructure engineered to meet high-demand scenarios
  • How efficiency and resilience were integrated as core design principles throughout

Related Episodes