This episode will be available to stream at 10am GMT.
The transition towards high-density workloads and large-scale campuses is creating new challenges for data center construction in APAC. What used to be 20-30 megawatt buildings are now turning into 500-megawatt or more campuses, meaning new solutions are required around land, power and supply chain. This episode will explore how data center construction in APAC is adapting to these higher-density builds, including:
- Designing for hybrid and liquid cooling, or the the possibility of retrofit in the future
- The impact of accelerated growth in secondary markets Johor, Jakarta and Thailand
- Overcoming power and water constraints with solutions such as behind-the-meter
- The changing role of modularity in accelerating speed-to-market