Tech showcase: Autonomous robotic solution for complex layouts

  • Watch on-demand now
  • The Data Center Construction Channel
Speakers

This episode is available to stream on-demand

Data center projects demand uncompromising precision and speed. Minor errors in marking or elevation can cascade into misaligned installations and costly rework. In this tech showcase, HP SitePrint, an autonomous robotic layout solution, integrates floor level measurement and data processing for real-time floor deviation marking, while printing accurate layouts, all with a single robot. We will explore how to:

  • Boost productivity up to 10X with robotic layout
  • Perform multi-trade layouts with the same tool for seamless collaboration across trades
  • Get layout accuracy that is consistent and repeatable, so prefab components fit perfectly
  • Combine floor level data capture, processing, and deviation marking in a single workflow

Related Episodes