Connect | New York // Tech Showcase: Bridging the power gap through on-site power generation | Life Cycle Power
- —
- Showcase Stage
- Mission Critical Power
- Open Session
Speakers
SVP, Commercial Strategy, Life Cycle Power
Portfolio Director, DCD
Rising power demand and grid interconnection delays are creating significant challenges for data center development across the United States. Increasing power density, projected to reach up to 600 kW per rack within the next two years, combined with lengthy ISO interconnection timelines, is pushing project approvals out by years.
As a result, on-site power generation is becoming a critical solution. By 2030, an estimated 38% of new data center developments may incorporate on-site generation, with up to 27% potentially operating fully off grid.
Flexible, rapidly deployable on-site power solutions are emerging as essential infrastructure to bridge power gaps, enable growth, and ensure reliable energy availability when and where it is needed most.