Episode Future-proofing the data center - how changing workloads are innovating design in APAC Watch on-demand
Episode Is onsite generation the only feasible option for renewable power in Tier 1 markets? Watch on-demand
Episode Tech showcase: New Tate Grid LEC - Halve the embodied carbon of your structural ceiling solutions Watch on-demand
Episode Panel: How can digital infrastructure keep up with the pace of demand in 2024? Watch on-demand
Episode How are digital twins providing a holistic approach to data center management? Watch on-demand
Episode Panel: How can building for heat reuse become an economic and practical reality? Watch on-demand
Episode Case study: Unlocking carbon emissions strategy in data center design and build at scale Watch on-demand
Episode Fireside chat: Does the advent of AI mean that we need to completely rethink data center design? Watch on-demand
Episode Panel: FLAP-D vs secondary markets - which will become Europe’s data center hotspot? Watch on-demand
Episode Fireside chat: Navigating data center construction & resilience in the midst of power instability Watch on-demand
Episode Fireside chat: How to harness prefabrication for sustainability & agility at scale Watch on-demand
Episode Fireside chat: How is power infrastructure evolving to support data center build? Watch on-demand
Episode Panel: Are secondary markets equipped to meet the demand in data center growth? Watch on-demand
Episode Fireside chat: Is scaling up at speed the key to realizing your data center deployment goals? Watch on-demand
Episode Fireside chat: Getting ready for AI - How is high-performance computing going to affect how data centers are designed & built? Watch on-demand
Episode Panel: Building for change - how can data centers have a positive social impact in local communities? Watch on-demand
Episode Panel: Is decentralization going to fundamentally change the data center landscape in APAC? Watch on-demand